Description
Roof: remove existing slates and lead flashing/hips, lay breathable felt membrane and new battens, re-tile with existing slates, new code 4 lead flashing/hips. (Works already undertaken).
Gutters: repair, or replace with like guttering where necessary. (Works already undertaken).
Soffit boards: repair, or replace with like material where necessary. (Works already undertaken).
Pointing: where necessary, remove damaged pointing and replace with discreet lime pointing (Works already undertaken).
Repair all 5 existing sash windows where possible. (Works already undertaken).
Repair 5 stone window sills with lime mortar where possible and re-paint to match existing using breathable paint. (Works already undertaken).
Replace casement/shop window with new sash window as per enclosed drawing.
(Amended by drawing number COM001 rev.A and the following details: Structural engineers drawing, Structural Engineers report, and Window spec, received 12 March 2019).